This Day (Lagos)
3 January 2009
Over N260 billion is required to fix the 460 erosion sites in Imo State even as detailed engineering studies have been completed on 10 worth about N6 billion while work is ongoing in 30 sites with cost estimated at N19 billion. The rest of the 420 sites were yet to be investigated and properly evaluated.
[ See Article ]