New Vision (Kampala)

26 January 2011

Uganda: Awoja Bridge Repairs to Cost Sh7 Billion

SPECON has won the contract to construct Awoja bridge, the Uganda National Roads Authority has said. Awoja Bridge is located on River Awoja, 15km on the Soroti-Mbale road.

GAUFF will be the supervising consultant. The new bridge, to be financed by the European Union and the Government, will cost sh7.2b.

The scope of work involves construction of a new 7.5-metre carriageway bridge adjacent to the existing one, UNRA spokesperson, Dan Alinange said in a statement.

It will also involve construction of 600-metre approach embankments and provision of one-metre pedestrian walkways on either side of the bridge.

The project commenced on January 24 and will be completed in 12 months.

Meanwhile, Alinange has revealed that the contract for the reconstruction of the Jinja-Kamuli road has been awarded to Dott Services.

The contractor is mobilising, with a camp at Buwenge. The road will cost sh50b and will take two years to complete.

The Jinja-Kamuli road has not been repaired since 1989 and has numerous potholes and black spots that caused several accidents.

Ads by Google

Copyright © 2011 New Vision. All rights reserved. Distributed by AllAfrica Global Media (allAfrica.com). To contact the copyright holder directly for corrections — or for permission to republish or make other authorized use of this material, click here.

AllAfrica publishes around 2,000 reports a day from more than 130 news organizations and over 200 other institutions and individuals, representing a diversity of positions on every topic. We publish news and views ranging from vigorous opponents of governments to government publications and spokespersons. Publishers named above each report are responsible for their own content, which AllAfrica does not have the legal right to edit or correct.

Articles and commentaries that identify allAfrica.com as the publisher are produced or commissioned by AllAfrica. To address comments or complaints, please Contact us.