Uganda's Rural Electrification Gets Boost


The rural electrification drive has received a grant from the Dutch ORIO Infrastructure Fund of Euro's 13.1 million for feasibility studies.
  • Uganda:  Rural Electrification Gets Sh46 Billion

    New Vision, 23 January 2013

    The rural electrification drive has received a much needed boost of Euro's 13.1m (sh46.4b) from the Dutch ORIO Infrastructure Fund for feasibility studies leading to the ... read more »

Photo: New Vision

Awoya sub station: Rural Electrification gets Sh46 billion.