West Africa: Niso Connects Nigeria, Niger, Togo, Others to W/African Grid

10 November 2025

The Nigerian Independent System Operator (NISO), in collaboration with the West African Power Pool Information and Coordination Centre (WAPP-ICC), has successfully carried out the long-awaited synchronization test between the Nigerian power grid which includes Niger Republic and parts of Benin and Togo and the rest of the West African power grid.

A statement by NISO, said the test was conducted on Saturday, 8th November 2025, between 05:04 hours and 09:04 hours, and marks a major breakthrough in the ongoing efforts to establish a unified West African electricity grid operating at a single frequency.

It added that though several synchronization arrangements had been proposed in the past, the only known physical synchronization attempt took place in 2007 and lasted for about seven minutes before being discontinued.

"Following renewed engagements and enhanced coordination between NISO and the WAPP-ICC, the exercise has now been successfully accomplished through improved system monitoring, stricter frequency control, harmonized operational standards, and real-time communication among participating control centres."

Keep up with the latest headlines on WhatsApp | LinkedIn

It said the synchronization connects Area 1 (Nigeria, Niger, and parts of Benin and Togo) with Areas 2 and 3 (the rest of West Africa), creating a single operational grid that enhances reliability, stability, and cross-border energy exchange across the ECOWAS region.

"The initiative aims to achieve operational unification of the regional grid, improve system reliability through shared reserves, enable cost-effective power generation and trading under the West African Electricity Market (WAEM), and strengthen institutional cooperation among member system operators.

"For Nigeria, this achievement provides multiple benefits, including unlocking stranded generation capacity, enabling energy exports and foreign exchange earnings, improving grid resilience, and reinforcing the country's leadership role in regional energy integration. It also opens access to donor funding for priority transmission projects such as the North Core Project in Birnin Kebbi and the Ajegunle 330 kV Substation in Lagos State," it said.

It added that the successful synchronization marks a historic milestone in regional energy cooperation and demonstrates NISO's technical capacity to manage complex grid operations in line with international standards.

AllAfrica publishes around 600 reports a day from more than 90 news organizations and over 500 other institutions and individuals, representing a diversity of positions on every topic. We publish news and views ranging from vigorous opponents of governments to government publications and spokespersons. Publishers named above each report are responsible for their own content, which AllAfrica does not have the legal right to edit or correct.

Articles and commentaries that identify allAfrica.com as the publisher are produced or commissioned by AllAfrica. To address comments or complaints, please Contact us.